Example Details

Example:
Implement Complete Streets planning and construction projects (Landscaped safety medians, Pedestrian scale lighting, Sidewalks, Bicycle lanes, Bus bays)
Objective:
Accessibility
Strategy Category:
Transportation: Implement a connected network of Complete Streets and facilities for non-motorized modes and transit
Strategy:
Construct improvements: (II.A.5) Construct improvements to improve the pedestrian and bicycling environment
Originators:
City of Hollywood
Implementors:
City of Hollywood
Timeframe:
Current
Applies Systemwide?:
No
Comments:

In the City of Hollywood, several Complete Streets projects are underway or completed including:

• Johnson Street, from C10 Canal to US1 • Johnson Street, from 56th Ave to 64th Avenue • US-441/State Road 7 south of Pembroke Road to Stirling Road

Planned complete streets improvements include: - Hollywood Boulevard from Dixie Highway to City Hall - The FEC Corridor Greenway (Dixie Highway and 21st Avenue) from Pembroke Road to Sheridan Street - Tyler Street from Young Circle to Dixie Highway - A1A from Hollywood Boulevard to Sheridan Street - Federal Highway from Pembroke Road to Sheridan Street - State Road 7 from Pembroke Road to Atlanta Street

City of Hollywood Complete Streets Projects

Example last updated August 2017

Contact: Vielka Quintero, City of Hollywood Economic Development

Ex. ID 122

Facility Types and Functions What is this?

Primary Multimodal
Primary Function: Primary circulation within and between multimodal districts
Transit: Premium service
Walking & Biking: Emphasized with generous facilities for walking & biking
Non-Primary Hybrid
Primary Function: Lower speed alternative routes with access to local neighborhoods and local land uses. Provides connectivity for non-motorized modes.
Walking & Biking: Emphasized with slow auto speeds. Potential for traffic calming.
Go Back