Example:
I-95 Interchange modifications at Hallandale Bch Blvd
Objective:
Mobility
Strategy Category:
(A) Highway capacity: Increase auto capacity on highway facilities
Strategy:
Interchanges: (I.A.2) Improve performance of I-95 interchanges
Originators:
FDOT
Implementors:
FDOT
Timeframe:
Future: mid-term
Applies Systemwide?:
No
Comments:

Add a second right turn lane to the NB off-ramp terminal intersection and widen the SB on-ramp to facilitate the merging of westbound to southbound left turns with the eastbound to souhbound right turns. The traffic operational analysis and the concept plan will be prepared by RS&H under TWO #14 of the DW General Services Support Contract FM #424075-2-12-01; Contract No. C9C16. The Consultant will prepare and IOAR and the Concept Development Team will review the report and the concept. The years of analysis for the IOAR are 2020 (opening year), 2030 (interim year) and 2040 (design year).

Interchange Concept Development Report (ICDR) for I-95 at Hallandale Beach Boulevard. The ICDR report is part of the I-95 Broward Interchange Master Plan.

A PD&E study from Hallandale Beach Blvd to Hollywood Blvd is planned for FY 2016 and 2017 under FM# 436903-1.

Example last updated July 2016

Contact: Cesar Martinez, FDOT D4 PLEMO

FM #424075-2, #436903-1

Ex. ID 012

Facility Types and Functions What is this?

SIS Facilities
Primary Function: Higher-speed mobility for longer distance regional, commute and freight trips
Transit: Commuter express service