Example Details

Example:
Minor improvements to ramps at I-95/Glades Road interchange as part of Glades Rd PD&E Study
Objective:
Mobility
Strategy Category:
(A) Highway capacity: Increase auto capacity on highway facilities
Strategy:
Bottlenecks: (I.A.3) Make strategic investments to relieve congestion at critical bottlenecks
Originators:
FDOT
Implementors:
FDOT
Timeframe:
Future: long-term
Applies Systemwide?:
No
Comments:

Transportation System Management (TSM) project consisting of improvements to nine roadway sections. PD&E is complete, transit study is on-going but no funding is currently available.

SR-7 at Glades Road: Add third NB and SB left turn lanes, provide seven-foot wide bicycle lanes, provide a shared use path on the west side, and a sidewalk on the east side. Glad Rd. from west of Airport Rd. to west of W. University Dr.: Construct new six-foot wide concrete sidewalk along new westbound auxiliary lane.

Example last updated August 2017

Contact: Anson Sonnett, FDOT D4 Design

FM #233166-2

Ex. ID 019

Facility Types and Functions What is this?

SIS Facilities
Primary Function: Higher-speed mobility for longer distance regional, commute and freight trips
Go Back