Example Details

Example:
Conduct consensus building effort on SW 10th Street to find a workable solution.
Objective:
Coordination
Strategy Category:
Coordination amongst other planning partners
Strategy:
Utilize existing processes: (III.B.3) Utilize existing processes for communication
Originators:
City of Deerfield Beach
Implementors:
Broward MPO
Timeframe:
Current
Applies Systemwide?:
No
Comments:

The Broward MPO conducted a consensus building effort for SW 10th Street to determine what can and should be done through public involvement. The MPO Board approved the consensus-building effort's recommendations, and FDOT has included a PD&E study for this project in its 2018 work program.

Link.

The City of Deerfield Beach's engineering department has been involved in this effort.

Example last updated August 2017

Contact: Paul Calvaresi, Broward MPO

Ex. ID 304

Facility Types and Functions What is this?

SIS Facilities
Primary Function: Higher-speed mobility for longer distance regional, commute and freight trips
Primary Multimodal
Primary Function: Primary circulation within and between multimodal districts
Primary Commerce
Primary Function: Mobility primary for freight and regional trips and employment center access
Non-Primary Hybrid
Primary Function: Lower speed alternative routes with access to local neighborhoods and local land uses. Provides connectivity for non-motorized modes.
Go Back