Example Details

Example:
Ramp metering is under consideration on the I-95 Express Lanes Phase 3.
Objective:
Mobility
Strategy Category:
(A) Highway capacity: Increase auto capacity on highway facilities
Strategy:
Ramp Metering: (I.A.5) Implement ramp metering in Broward and Palm Beach Counties
Originators:
FDOT
Implementors:
FDOT
Timeframe:
Future: short-term
Applies Systemwide?:
No
Comments:

Still in consideration when presented to FTBA Construction Conference by FDOT on February 11-12, 2014.

I-95/SR 9 from south of Broward Blvd (MP 9.011) to N of Commercial Blvd (MP 15.537): This project consists of adding two Express (Managed) Lanes in each direction along the center of the existing I-95 corridor. One of the Express Lanes will result from conversion of the existing HOV lanes, and the second Express Lane will be accounted for via roadway widening. The existing General Use Lanes and Auxiliary Lanes will remain. Project length: 6.526 mi.

I-95/SR 9 from N of Commercial Blvd (MP 15.537) to SW 10th Street (MP 23.710): This project consists of adding two Express (Managed) Lanes in each direction along the center of the existing I-95 corridor. One of the Express Lanes will result from conversion of the existing HOV lanes, and the second Express Lane will be accounted for via roadway widening. The existing General Use Lanes and Auxiliary Lanes will remain. Project length: 8.173 mi.

http://web.ftba.com/external/wcpages/wcmedia/documents/I95ExpressPhase3-MajorProjects-AntonioCastro.pdf

Example last updated July 2016

Contact: Robert Bostian, FDOT D4 Design

FM #433108-4, #433108-5