Example Details

Example:
SR 7/US 441 from Commercial Blvd to Sample Road Fiberoptic Connection
Objective:
Mobility
Strategy Category:
(C) Preserve existing capacity: Preserve and optimize vehicular capacity on regionally significant facilities
Strategy:
Information Technology: (I.C.1) Utilize information technology to improve network efficiency and provide real-time information to travelers
Originators:
FDOT
Implementors:
FDOT
Timeframe:
Current
Applies Systemwide?:
No
Comments:

Project will be let April 2017 with construction expected in 2017 (FM# 427937-2).

Example last updated July 2016

Contact: Melissa Ackert, FDOT D4 Traffic Operations; Brent Lee Shue Ling, FDOT D4 Design

FM #427937-2

Ex. ID 499

Facility Types and Functions What is this?

Primary Multimodal
Primary Function: Primary circulation within and between multimodal districts
Go Back