Oakland Park Boulevard: Several short and long term improvements were proposed. A Business Access and Transit (BAT) lane was approved as the long term solution. This corridor is currently a MPO priority as a Rapid Bus Transit Corridor.
SR 820/Pines/Hollywood Blvd. corridor improvement projects. Several locations are involved along the corridor. Lighting upgrades and pedestrian related signal improvements proposed at certain locations. Typical sections of several roadways within project limits will be modified to accommodate bike lanes and shared use lanes (sharrows) as needed. Milling and resurfacing will be done to address any restriping needed to install proposed improvements. Widening will be done in certain location to accommodate installation of bike lanes and turn lane modifications as needed.
Hollywood Pines Project Link (Broward MPO)
Bike lane and sidewalk improvements are planned on Hollywood Boulevard from City Hall Circle to Dixie Highway. These improvements include pedestrian and roadway lighting, pedestrian flashers on five proposed mid-block crossings, a 12-foot sidewalk constructed with colors and patterns, parallel parking, planters, and a 6-foot buffered bike lane. Letting for this project occured in March 2017.
These improvements resulted from the Broward MPO’s Hollywood/Pines Boulevard Congestion Management Process and Livability Planning Project.
Example last updated August 2017
Contact: Khalilah Ffrench, FDOT D4 OMD; Lola Benitez, FDOT D4 Design
FM #431770-1, #429569-1
Ex. ID 490, 491, 549
Primary Multimodal | |
---|---|
Transit: | Premium service |
Multimodal Districts & Nodes | |
---|---|
Transit: | Areas served by premium or frequent fixed route service |