Example Details

Example:
I-95 Interchange modification at Atlantic Blvd as part of I-95 express lanes.
Objective:
Mobility
Strategy Category:
(A) Highway capacity: Increase auto capacity on highway facilities
Strategy:
Interchanges: (I.A.2) Improve performance of I-95 interchanges
Originators:
FDOT
Implementors:
FDOT
Timeframe:
Future: mid-term
Applies Systemwide?:
No
Comments:

Part of Express Lanes Phase 3A. Interchange Justification/Modification is funded under FM# 436959-1 in 2017. Anticipated bid date of summer 2020.

The proposed typical section for Atlantic Blvd. remains the same as the existing, except for geometric modifications required for the ramp terminals, the intersection at NW 6th Ave. and to introduce designated bike lanes.

Example last updated July 2016

Contact: Cesar Martinez, FDOT D4 PLEMO

FM #436959-1

Ex. ID 513

Facility Types and Functions What is this?

SIS Facilities
Primary Function: Higher-speed mobility for longer distance regional, commute and freight trips
Go Back