Example Details

Example:
SR 7 / US 441 Improvements Project in West Park, Miramar, and Hollywood
Objective:
Mobility
Strategy Category:
(A) Highway capacity: Increase auto capacity on highway facilities
Strategy:
Parallel facilities: (I.A.4) Enhance capacity on parallel roads
Originators:
FDOT
Implementors:
FDOT
Timeframe:
Current
Applies Systemwide?:
No
Comments:

SR 7 / US 441 from SW 25th Street to Fillmore Street

Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and adding pedestrian countdown timers at Pembroke Road, Washington Street, and Hollywood Boulevard, improving street lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway.

Expected completion: Spring 2018

Link to Project Website

Example last updated July 2016

Contact: James Ford, FDOT D4 Design

FM #227774-1

Ex. ID 459, 465

Facility Types and Functions What is this?

SIS Facilities
Primary Function: Higher-speed mobility for longer distance regional, commute and freight trips
Freight: Designed for high-speed regional freight movement
Go Back