SR 7 / US 441 from SW 25th Street to Fillmore Street
Project improvements include adding one through lane in each direction for a total of six lanes with left turn lanes separated by raised medians, constructing new storm sewer system and retention ponds, installing new water and sewer lines, constructing bus bays at current bus stop locations, constructing curbs and gutters, adding or replacing sidewalks with ADA compliant ramps on both sides of the road, upgrading existing signalized intersections with mast arms and adding pedestrian countdown timers at Pembroke Road, Washington Street, and Hollywood Boulevard, improving street lighting along the corridor by installing new lighting system along the west side of SR 7 / US 441, adding Intelligent Transportation System components including digital message signs and traffic monitoring cameras, and resurfacing the roadway.
Expected completion: Spring 2018
Example last updated July 2016
Contact: James Ford, FDOT D4 Design
FM #227774-1
Ex. ID 459, 465
SIS Facilities | |
---|---|
Primary Function: | Higher-speed mobility for longer distance regional, commute and freight trips |
Freight: | Designed for high-speed regional freight movement |