Example Details

Example:
Adjust signal phasing to make Dixie Highway more conducive to business
Objective:
Mobility
Strategy Category:
(C) Preserve existing capacity: Preserve and optimize vehicular capacity on regionally significant facilities
Strategy:
Traffic Signals: (I.C.2) Update traffic signal operations
Originators:
City of Hallandale Beach
Implementors:
FDOT
Timeframe:
Future: short-term
Applies Systemwide?:
No
Comments:

The City of Hallandale Beach cited the split phasing along Dixie Hwy as a challenge to achieving redevelopment along the corridor. The City indicated that the split phasing causes large back-ups on Dixie Highway. The City would like to explore the possibility of altering the signal phasing.

Example last updated August 2017

Contact: Eric Houston, City of Hallandale Beach; Melissa Ackert, FDOT D4 Traffic Operations

Ex. ID 057

Facility Types and Functions What is this?

Primary Multimodal
Primary Function: Primary circulation within and between multimodal districts
Go Back