Example Details

Example:
Implement Complete Streets projects
Objective:
Accessibility
Strategy Category:
Transportation: Implement a connected network of Complete Streets and facilities for non-motorized modes and transit
Strategy:
Construct improvements: (II.A.5) Construct improvements to improve the pedestrian and bicycling environment
Originators:
City of Pompano Beach
Implementors:
City of Pompano Beach
Timeframe:
Current
Applies Systemwide?:
Yes
Comments:

The City finished a Complete Streets project along Atlantic Blvd in 2013, and designated Martin Luther King Jr Blvd as a Context Sensitive Corridor in the Broward County trafficways plan. In 2013, the City had plans prepared for Complete Streets projects along Riverside Dr, Briny Ave, and MLK Blvd. The City was also examining lane repurposing projects anlong Dixie Hwy and East Copans Rd.

Complete Streets Priority List: 1. Dixie Hwy - SW 2nd St. to NW 10th St. Description: $8.5 million (complete streetscape, road resurfacing, new wider sidewalks, landscape, irrigation, lighting); (Complete Street Components Strat. Category IIA) Local Funding Availability:6/2018*

  1. Dixie Hwy - McNab Rd. to SW 2nd St. Deacription: Resurfacing plus lane removal - $6 million) (complete streetscape, road resurfacing, new wider sidewalks, landscape, irrigation, lighting); (Complete Street Components Strat. Category IIA) Local Funding Availibility: 6/2020*

  2. Dixie Hwy NW 10 to Copans Description: $8.5 million (complete streetscape, road resurfacing, new wider sidewalks, landscape, irrigation, lighting); (Complete Street Components Strat. Category IIA) Local Funding Availability: 6/2022*

  3. A1A (partner with State and/or other municipalities) Entire City length Description: Bike/ped., Landscaping, Overhead Conversion improvements (design of Overhead Conversion almost complete); (Complete Street Components Strat. Category IIA) Local Funding Availability: 6/2019*

  4. Subject to passage of the 2018 General Obligation Bond Referendum.

  5. NE 33 Street N. Dixie Hwy to N. Federal Hwy. Description: Install lighting, safety crossings & traffic calming; (Complete Street Components Strat. Category IIA) Local Funding Availability: 6/2022 $2 million

6.Riverside Dr. Atlantic Blvd. to NE 1st St. Desricption: Install sidewalks, resurface & curve rd.; (Complete Street Components Strat. Category IIA) Local Funding Availability: 6/2020 $6 million

  1. McNab Rd. Bridge & Approach Description: Have Design $, need Reconstruction $ for widening, increasing ht. & improving drainage on approach; (Complete Street Components Strat. Category IIA) Local Funding Availability: 6/2018* $6 million

  2. Lion’s Park Neighborhood Streets & sidewalks (see attached Map of Subdiv.) Description: Landscaping & Sidewalk installment to coincide with water & sewer upgrade; (Complete Street Components) Local Funding Availability: 6/2021 $10 million

  3. Bus Shelters Citywide Description: 180 to 200 shelters that don’t have 25 riders / hour. (Strat. Category IIB) Local Funding Availability: 6/2018 $2.5 million

  4. Subject to passage of the 2018 General Obligation Bond Referendum.

Example last updated August 2017

Contact: Maggie Barszewski, City of Pompano Beach Planning & Development Management

Ex. ID 601

Facility Types and Functions What is this?

Primary Multimodal
Walking & Biking: Emphasized with generous facilities for walking & biking
Non-Primary Hybrid
Walking & Biking: Emphasized with slow auto speeds. Potential for traffic calming.

Place Types and Functions What is this?

Multimodal Districts & Nodes
Walking & Biking: Right-of-way has balance for walk/bike facilities and transit/auto. Focus on connectivity to transit stations
Go Back