Example Details

Example:
Coordinate with land owners to reconfigure access points through pavement maintenance
Objective:
Mobility
Strategy Category:
(C) Preserve existing capacity: Preserve and optimize vehicular capacity on regionally significant facilities
Strategy:
Access Management: (I.C.4) Implement access management by reducing the number of driveways and curb cuts
Originators:
City of Hollywood
Implementors:
City of Hollywood
Timeframe:
Current
Applies Systemwide?:
No
Comments:

The City of Hollywood annually funds a 50/50 shared cost sidewalk replacement program in partnership with residents to assist residential property owners with their necessary sidewalk repairs abutting their properties. Typical construction costs are approximately $150.00 for a 5’ by 5’ sidewalk section of which the homeowner share would be reduced by 50% to $75.00 per section. Upon request, the City will inspect the sidewalk and provide a firm construction cost estimate for your consideration.

Hollywood homeowners interested in the program they need to call Engineering Services at 954.921.3900.

Example last updated August 2017

Contact: Clarissa Ip, City of Hollywood Development Services

Ex. ID 063

Facility Types and Functions What is this?

Primary Multimodal
Primary Function: Primary circulation within and between multimodal districts
Primary Commerce
Primary Function: Mobility primary for freight and regional trips and employment center access
Go Back