Objective: Accessibility

Category: Transportation: Implement a connected network of Complete Streets and facilities for non-motorized modes and transit

Strategy: Prioritize investments: (II.A.4) Prioritize investments for pedestrian, bicycle, and transit improvements in Multimodal Districts and along Primary Multimodal facilities

Click on an example to view the example details. Go Back
Description Objective Originators Implementors Timeframe
Prioritize investments for bicycle and pedestrian improvements in Multimodal Districts Accessibility Broward MPO Broward MPO Future: short-term
Shift the focus of Complete Street implementation from corridors to networks branching out from future Mobility Hubs, especially sidewalks and bike lanes branching out from future FEC stations Accessibility FDOT All Future: short-term
Prioritize bicycle and pedestrian improvements providing connections to transit corridors Accessibility Broward MPO Broward MPO Current
Prioritize investments for SIS Connector Improvements Accessibility FDOT FDOT Future: short-term
Develop an agreement for expediting lane modification process for designated Complete Streets Accessibility Cities (multiple) FDOT Completed
Develop a points-based system for ranking local bicycle and pedestrian projects in the LRTP process to determine prioritization and selection for funding Accessibility Palm Beach MPO Palm Beach MPO Current
Invest in streetscape improvement projects to improve the environment for pedestrians, bicyclists, and transit riders Accessibility City of Miramar City of Miramar Current
Incorporate future right-of-way needs for multimodal improvements into the Broward County Trafficways Plan as a way to document the future multimodal vision for these corridors. Accessibility Broward County BCPC Inactive
Develop a pedestrian access plan to identify improvements for access to Tri-Rail stations and coordinate with local governments to prioritize pedestrian improvements in station areas. Accessibility SFRTA SFRTA Completed
Apply for FDOT's TDLC designation on US-1 (Federal Highway) and other corridors (e.g. Dania Beach Blvd) to enable streetscape and Complete Street improvements Accessibility City of Dania Beach City of Dania Beach Current
Complete Streets Demonstration Projects: Hollywood Blvd from City Hall to Dixie Highway and Sunset Strip in the City of Sunrise from NW 72nd Ave to NW 19th St. Accessibility FDOT Broward MPO, FDOT Current
US 1 Improvements Project from Broward Blvd to NE 17th Way in Fort Lauderdale Accessibility FDOT FDOT Current
A1A Improvements Project from East of the Mercedes River Bridge to Sunrise Blvd in Fort Lauderdale Accessibility FDOT FDOT Current
Plan for future Deerfield Beach Tri-Rail Coastal Link Station Accessibility City of Deerfield Beach City of Deerfield Beach Future: short-term
Create and implement a Complete Streets and other Localized Initiatives Program (CSLIP) to fund design and construction of local government complete streets projects based on needs identified by local governments. Accessibility Broward MPO Broward MPO Ongoing